Tuesday, January 29, 2008

The toilet is back!!!

Yes it's true! That is our big news! There are pictures below. But to get caught up before that, Sunday we went supply shopping because, among other things, we had bought the wrong grout. We needed sanded grout, but initially we had thought we needed unsanded grout for some reason. We also bought paint for the walls. I thought it was interesting how relatively fast and easy it was to choose paint colors for the bathroom. When we did the kitchen the paint colors were a huge decision and we were kind of anxious about them. On Sunday we picked out paint for the bathroom in about 2 minutes. The wainscot and trim will be a shade of white, and the wall portion will be a light sage green.

On Monday night Dave started grouting. He got nervous about getting it right, so we asked Mark for some coaching. Mark and Dave worked then worked together for awhile, and by the end Dave got Mark wine refills and chatted while Mark finished it up. We are really happy with the grouting! This is Mark and Dave at the end of the job.








And tonight we got the toilet back! We decided to stick with the toilet that came with the house since it's relatively new anyway and looks fine with the tile. Our plumber neighbor told us that he replaced the toilet for the previous owner not long before the house went up for sale.

The next task is to seal the grout. This weekend we will work on the walls....

Saturday, January 26, 2008

8 Hours Later...

We are just about done laying the tile! (We are also both exhausted.) We did everything except the little back part, which we will do tomorrow after the rest sets. The small tiles minimized the amount of cutting we had to do. It was a bit of a challenge to get everything flat over the radiant heat mats but hopefully it will be worth it. Mark was here for most of the day getting the upstairs ready to move in, and it we were grateful to have him around to consult and offer support. Initially we thought that I, being the more detail oriented one, would be the one to lay the tile and Dave would cut. But we quickly discovered that I am maybe too detail oriented to efficiently lay tile and that Dave would have to do it if we ever wanted to finish. It looks like he did a good job, and I enjoyed cutting. Whenever we got frustrated, we just reminded ourselves how gross the old bathroom floor was (with the carpeting) and we knew that whatever we did would definitely be an improvement.





I did this corner piece:












These two bummed around in bed all day while we worked.

Friday, January 25, 2008

Bathroom progress...

We have worked on the bathroom as much as we can this week. On Tuesday we cut cement board to put on top of the wood floor. It was a long (5 hours) process for a relatively small bathroom! We also took the toilet out. Here is a picture of Dave siphoning water out of the toilet prior to its removal. On Wednesday we glued down the cement board with mastic. Thursday we (Dave, really) filled in the joints and taped them.

My job on Wednesday and Thursday was to go to Lowes for a radiant heat mat to install under the tiles and to go to Home Depot for tiles and grout. Our bathroom is generally cold, so we wanted to add radiant heat to make it more cozy. Dave wired in and glued down the radiant heat mat yesterday. Today is tile installation day! These photos show the floor with the cement board, the radiant heat mat, and the tiles we picked.

As you can see, we are also working on the walls. We know it's best to do the walls first and then the floor, but Ann, Mark, and Stella are moving in upstairs very, very soon and Dave and I wanted to get the floor done first so we can get our own bathtub and toilet back.

Monday, January 21, 2008

The downstairs bathroom.....

Here we go! You may have wondered why we have never posted pictures of the downstairs bathroom on the blog. It's because we have not been big fans of it. The woman who lived here before us was into carpeting and she ended up putting some in the bathroom! So I went to Rochester over the weekend and Dave pulled up the carpeting and pads and started working on the floor. Today I got home and the clawfoot tub was in the garage!!! Mark helped him take it out, and I am amazed that they got it out there. Now we were going to work as much as possible to get the floor tiled. This is the bathroom tonight. Sorry I didn't get the proposed tile in the photo. It's white octagons with black dots in between the octagons. Hopefully I will be able to post them soon.

Speaking of tile, we also tiled the backsplash in the pantry. We had to get new moulding to put around it and once we get it on we can grout it. Here it is. The tiles are seconds from our friend Jess's family's store in Santa Fe. They look like pretty great seconds to us!